Operation
and Maintenance of Power Plants
OFS
has expertise in Operation & Maintenance on turnkey basis
of Power Plants along with its Systems and sub-systems. We
provide experienced Engineers and technicians to manage the
power plants. Our qualified team takes care of all Operational & Maintenance
requirement of the Power Plant.
The
services rendered by us include :
| > |
Take
up complete operation of the Plant. |
| > |
Total
maintenance of the Plant. |
| > |
Operational
spares inventory. |
| > |
Proper
management of the Plant. |
| > |
Recommendations
for improvement in Operational parameters and procedures. |
| > |
Preparation
of O & M manuals and revisions of the same. |
| > |
Perform
scheduled and preventive maintenance to minimize equipment
shutdown time, minimize equipment failures and reduce
maintenance expenditures. |
| > |
Monitor
performance & efficiency of the plant, systems
and sub-systems included in the scope of the work regularly
and work out action plan to improve. |
| > |
Carryout
special maintenance as per manufacturer's recommendations
and supervise overhauling of the major equipments. |
| > |
Provide
necessary technical, administrative support to our
clients for procurement, transportation and storage
of spares, stores, tools and consumables wherever necessary. |
| > |
Follow
HSE procedures. |
|
|
 |
OFS
is currently executing the O & M Contract for the Combined
Cycle Power Plant of ONGC at their Central Processing Facility
at Gandhar. Following are the major Systems & Sub-systems
installed which are covered under this contract :
| > |
Gas
Turbine GE Make - Model Frame - V, its Generator of
20 MW capacity and its associated systems and equipments. |
| > |
Steam
Turbine - Model NK 40/56/20-3 with Generator BHEL make
11 MW capacity and its associated systems and equipments. |
| > |
HRSG
64 Tones / Hour and its associated systems and equipments. |
| > |
Various
Data Acquisition & Control systems installed in
the plant. |
| > |
Cooling
water system with 4 Nos. water pumps Becon - Weir /
400 - 500. |
| > |
DM
Water plant 2 X 18 Cu. Mtr / Hr along with its sub-systems. |
| > |
Air
Compressors - 3 Nos. and its air dryers. |
| > |
3
Cell ID Cooling Tower Paharpur make along with its
chemical dosing system. |
| > |
FRP
Cooling Tower and its pumps. |
| > |
IAEC
Make package type boiler, 24 Kg / Sq. Cm. @ 255 Deg
C. and 6 TPh. |
| > |
66KV
switch yard I/c transformers 20/25MVA-2Nos. and its
control room. |
| > |
11
KV substation connecting GT/ST to load & GEB. |
| > |
Other
utilities installed within the battery limit of combined
cycle Power Plant. |
| > |
All
pipelines and fittings including valves installed within
the battery limit. |
| > |
Chlorine
Neutralization system. |
| > |
EOT
crane capacity - whip/main block - 5/20 tons. |
| > |
Fire
fighting system of GT. GTG, STG, Control room, Cable
trench and UPS room. |
| > |
All
electrical drives & their controls, APU, MCC, Batteries,
etc. |
| > |
Gas
conditioning skid. |
| > |
Black
Start DG set, 380 KVA Make Greaves (I) Ltd type TBD3V12
MK-1.
|
|
 |
List
of associated works :
| > |
Take
up work of Preparatory services ( including required
men & material) for annual inspection of HRSG and
IAEC make Package Boiler including obtaining operation
certificate from Boiler Inspector and completion of
boiler inspection as per the IBR and fulfillment of
recommendations of the Inspector to comply with the
regulations. This activity is done every year. |
| > |
OFS
provides skilled personnel to carry out HP –TIG
welding and radiography and other NDT for repair & maintenance
works and also minor modifications for improvement
of plant performance, as and when required, to comply
with IBR procedures and shall have to obtain certificate/clearance
from the concerned authority. |
| > |
OFS
arranges for hydro testing and /or NDT as applicable
of Static vessels (e.g. Air Receivers), Heat exchangers
as per the requirement of statutory / regulatory agencies. |
| > |
Take
up Filtration of transformer oil approx. 30,000 liters
once in a year, to bring BDV of the oil above 60 KV
after filtration. |
| > |
Take
up Relay Testing through OEM authorized agency. |
| > |
Take
up Thermography of equipments. |
| > |
Take
up Mechanical conditioning monitoring of equipments
twice in a year. |
| > |
Carry
out load testing of EOT crane through authorized agency
to the satisfaction of statutory authority. |
| > |
Arrange
to attend job of ONLINE sealing of HRSG valves and
flanges, as and when required. Job will be attended
by the expert team. |
| > |
To
get small fabrication and repair jobs done, including
supply of petty items of non capital nature, not available
in ONGC store, and required the keep the plant running. |
| > |
Co
ordinate with the OEM of following fire fighting
system half yearly and shall get the functioning
of the system tested and obtain the certificate to
that effect. However regular defects are attended
by us :-
CO2
based Fire Fighting system for GT and GTG
CO2 based Fire Fighting system for STG
|
| > |
Arrange
to get the functioning of Chlorine Neutralization system
tested & certified through ONGC approved Chlorine
Manufacturer or ONGC approved third party. |
|
 |
Technical
Backup
Steag
Encotec is our technical Consortium partner for the above project.
STEAG encotec is the Engineering branch of the STEAG Group. It a specialist
for the planning, consulting, engineering and operation & maintenance
of power plants and energy and environmental protection systems as well
as a supplier of IT systems and services.
STEAG encotec currently employs engineers, scientists, economists, power
sector experts and technicians; and has engineered and managed power
plants, infrastructure included, with a total capacity of more than 100.000
MW.
|